Remove Los Angeles Remove Manufacturing Remove Manufacturing Procurement Remove Shipping
article thumbnail

Editor’s Choice: Ocean Trends for 2021

Logistics Viewpoints

With summer winding down, we take a look back at the major trends that occurred in ocean shipping in the first half of 2021 and reflect on what your organization can do to proactively prevent major supply chain disruption. Today’s article is from FourKites and examines ocean trends for 2021. Global ramifications of port congestion.

article thumbnail

This Week in Logistics News (April 30 – May 6)

Logistics Viewpoints

Well, according to Czinger, a Los Angeles-based boutique hypercar manufacturer, that is about to be a possibility. Empty shipping containers stack up at US port depots. There has been a lot written about the need for shipping containers. At some point, it seems we all have the need for speed.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Pushing the Supply Chain Reset Button

Supply Chain Shaman

We have heard that there is a focus on near-shoring, reshoring, and local manufacturing. Building a fab (manufacturing site) takes two-to-four years and requires the availability of water and trained labor. For example, when I used to ship ice cream by reefer container to China from the west coast, the time on the ship was 12-18 days.

article thumbnail

Understanding the Shipping Container Shortage!

Supply Chain Game Changer

Shipping container shortage article and permission to publish here provided by Sam White at Argentus. The massive global shipping squeeze. In their story about the shipping shortage, the CBC quoted shipping analyst Alan Murphy, who detailed how this changing demand has massively disrupted the global shipping market.

Shipping 105
article thumbnail

Pushing the Supply Chain Reset Button

The Logistics & Supply Chain Management Society

We have heard that there is a focus on near-shoring, reshoring, and local manufacturing. Building a fab (manufacturing site) takes two-to-four years and requires the availability of water and trained labor.” For example, when I used to ship ice cream by reefer container to China from the west coast, the time on the ship was 12-18 days.

article thumbnail

Real-Time Visibility: The Key to Navigating Port Congestion

BlueYonder

Now all major ports in the United States are currently experiencing unprecedented congestion and labor shortages, leading to product stockouts and inflation — as well as significant supply chain challenges for retailers, manufacturers and logistics providers. While some critical U.S. To learn more watch LCT in action.

article thumbnail

Supply Chain Matters COVID-19 and Ukraine Conflict News Capsule Update- October 25 2022

Supply Chain Matters

West Coast Container Ship Backup Has Ended. In our Supply Chain Matters news capsule of September 27, we pointed out that business, supply chain and transportation media had reported this that the cost of shipping a container of goods from China to the U.S. Whereas the spot rate to ship a container from China to the U.S.

Ukraine 52