Remove 2012 Remove Forecasting Remove Manufacturing Procurement Remove Procurement Solutions
article thumbnail

Supply Chain Performance Declined In the Last Decade. The Question is Why?

Supply Chain Shaman

of revenue on information technology (IT), only six percent of manufacturers drove performance at the intersection of growth and margin. Average performance in 2016-2019 across twenty-seven manufacturing sectors on inventory turns, Return on Invested Capital and operating margin was worse than in 2012-2015. Rise in Inventories.

article thumbnail

6 Manufacturing Trends You Need to Know

Arena Solutions

The global manufacturing sector has seen an upswing, a technological renaissance of sorts. Since the start of 2012, more people graduating from college and universities are entering the engineering/manufacturing fields. Breaking it down In the U.S. 3 What’s the allure? Breaking it down In the U.S.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Save The Supply Chain Leader From Groupthink

Supply Chain Shaman

Business continuity continues to be a risk for many retailers and manufacturers. When it comes to inventory and driving improvement in the face of variability, there are five issues: Poorly Implemented Advanced Planning Solutions. Definition of Form and Function of Inventory: Source Supply Chain Insights. My take away?

article thumbnail

Navigating The Snails Trail: Moving to Outside-in Planning Processes

Supply Chain Shaman

In 2012, I published an article on Sales and Operations Technology (S&OP) Maturity. (I The order latency is the time from purchase by the end consumer to the visibility of the order. The higher the volume and the more forecastable the product, demand latency is days (usually two weeks). There is no definitive answer.

article thumbnail

Should We Celebrate this Marriage?

Supply Chain Shaman

At the time, we were both deployed as consultants for Manugistics to help a manufacturing company to implement end-to-end planning. The software planning footprints are reminiscent of the work done in the 1990s when we struggled with insufficient memory using 32-bit hardware. Ellen currently works as a consultant at Cap Gemini.

article thumbnail

My Take: E2open Buys Terra Technology

Supply Chain Shaman

As an analyst in the supply chain market for 15 years, I have written many articles on best-of-breed technology companies purchased by a larger company. The initial software product release name was Real-Time Forecasting. DS replaced rules-based forecast consumption with better math (statistics and pattern recognition).

article thumbnail

Making Cents Out of Demand Sensing

Logility

Sometimes demand planners focus too much on forecast accuracy and miss seeing the forest for the trees. I was guilty of this from time to time when I led a demand-planning group because we were evaluated on forecast accuracy as one of our key metrics. This sounds a lot like the definition for demand planning to me.